{"id":13317,"date":"2024-01-15T14:25:44","date_gmt":"2024-01-15T14:25:44","guid":{"rendered":"https:\/\/www.projectsmallhouse.com\/blog\/?p=13317"},"modified":"2024-03-25T14:29:21","modified_gmt":"2024-03-25T14:29:21","slug":"site-preparation-for-our-new-modular-cabin","status":"publish","type":"post","link":"https:\/\/www.projectsmallhouse.com\/blog\/2024\/01\/site-preparation-for-our-new-modular-cabin\/","title":{"rendered":"Site Preparation for Our New Modular Cabin"},"content":{"rendered":"<p>The Cabin Planning Guide from Westwood Cabins lists three phases and we are nearly at the end of the last phase, site work to get our property ready for the home.<\/p>\n<p>Westwood Cabins suggested a local contractor, Taylor Fowler. He had helped with a cabin in Brevard. The name sounded vaguely familiar, so I looked him up on Facebook. He knows a lot of people we know. And he had done some work for my mom a couple of years ago.<\/p>\n<p>Taylor Fowler could put in the driveway, grading and the foundation and we could pull all the permits and hire the rest of the trades. Or he can be our contractor, pull the permits and supervise the work. Tempting as it is to micromanage, Cliff (my husband) has a job and contractor is not his job. Taylor will be our contractor.<\/p>\n<blockquote><p>Contact a contractor for :<br \/>\n(including but not limited to)<br \/>\n\u2022 Obtaining required permits<br \/>\n\u2022 Utility access and hook-ups<br \/>\n\u2022 Driveway<br \/>\n\u2022 Foundation (including anchoring to cabin)<br \/>\n\u2022 Installation of transition trim to cover connection of house to foundation<br \/>\n\u2022 Porches, steps, landscaping, etc.<\/p>\n<p>Westwood Cabins Cabin Planning Guide<\/p><\/blockquote>\n<p>We could have been preparing the foundation for the cabin while it was being built, but things just happened way faster than we expected. The cabin is done and we need to finish getting the site prepared.<\/p>\n<p>Earlier we went out with pink flags and string, measuring the lot lines, the set backs and deciding where to place the cabin. I was surprised to realize that 52 feet is longer than you think. The cabin is the same length as our house is now. And once it has a porch on one side and a carport on the other side, it is 40 or so feet wide. That is really a bigger footprint than I was imagining.<\/p>\n<figure id=\"attachment_13312\" aria-describedby=\"caption-attachment-13312\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13312\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/clearing_brush-b.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13312\" class=\"wp-caption-text\">Clearing the rest of the field to prepare for the contractor<\/figcaption><\/figure>\n<p>Cliff has been working on clearing the field the cabin will go in. Now we need to finish it up.<\/p>\n<figure id=\"attachment_13313\" aria-describedby=\"caption-attachment-13313\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13313\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/clearing_brush-a.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13313\" class=\"wp-caption-text\">Clearing Brush where our cabin will go<\/figcaption><\/figure>\n<p>I sure am glad he bought the old pickup truck. It is sure a lot easier than hauling all of that brush by hand. And I am glad a lot of\u00a0 the plants have died back. There is a lot less brush in the winter than there was when we started.<\/p>\n<figure id=\"attachment_13316\" aria-describedby=\"caption-attachment-13316\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13316\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-footers.jpg?resize=500%2C500&#038;ssl=1\" alt=\"\" width=\"500\" height=\"500\" srcset=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-footers.jpg?w=500&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-footers.jpg?resize=150%2C150&amp;ssl=1 150w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><figcaption id=\"caption-attachment-13316\" class=\"wp-caption-text\">Footers for Westwood Modular Cabin<\/figcaption><\/figure>\n<p>There is still a lot left to do. We need the footers, a foundation, utilities, a driveway&#8230;<\/p>\n<blockquote><p>Lay Foundation<br \/>\n\u2022 This step will be handled by your contractor but we will work closely with them to ensure proper fitting.*<\/p><\/blockquote>\n<p>This is a photo from Westwood Cabins Facebook page. I think this cabin is smaller than the one we are putting in.<\/p>\n<figure id=\"attachment_13314\" aria-describedby=\"caption-attachment-13314\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13314\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-foundation.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13314\" class=\"wp-caption-text\">Foundation for Westwood Modular Cabin<\/figcaption><\/figure>\n<p>Our foundation will be 40&#8243; high, higher than this one.<\/p>\n<p>We also need a water service line, sewer service line and electrical service.<\/p>\n<blockquote><p>Prepare Utilities<br \/>\n\u2022 Water\/sewer lines stubbed inside of the foundation walls, ready for final hookup once home is set.<br \/>\n\u2022 After home is set and the building department gives approval, final power can be installed.<\/p><\/blockquote>\n<figure id=\"attachment_13311\" aria-describedby=\"caption-attachment-13311\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13311\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/clearing_brush-c.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13311\" class=\"wp-caption-text\">Clearing where the driveway will go<\/figcaption><\/figure>\n<p>We also need a driveway. And we need to be sure that the truck delivering the cabin can reach the foundation.<\/p>\n<blockquote><p>Confirm Clear Entry for Delivery\/Set Date<br \/>\n\u2022 Double check with Westwood Cabins for proper delivery prep &amp; requirements.<\/p><\/blockquote>\n<p>The cabin is 16-feet wide at edges of the roof, so we need to make sure the truck has 16-feet clearance to get in. That is not a problem.<\/p>\n<figure id=\"attachment_13309\" aria-describedby=\"caption-attachment-13309\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13309\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-delivery-a.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13309\" class=\"wp-caption-text\">Placing the Westwood Cabin on the Foundation<\/figcaption><\/figure>\n<h2>How much space do we need?<\/h2>\n<p>If there is enough space, the cabin can be slid into place from the truck. The truck and trailer are 60-feet long.<\/p>\n<figure id=\"attachment_13320\" aria-describedby=\"caption-attachment-13320\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13320\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-delivery-c.jpg?resize=500%2C209&#038;ssl=1\" alt=\"\" width=\"500\" height=\"209\" \/><figcaption id=\"caption-attachment-13320\" class=\"wp-caption-text\">Cabin slid into place by truck<\/figcaption><\/figure>\n<p>We want to be sure the truck has enough room to put the cabin into place. There has to be at least 60-feet available on one side of the foundation to be able to back it up and slide it off.<\/p>\n<figure id=\"attachment_13319\" aria-describedby=\"caption-attachment-13319\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13319\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-delivery-crane.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13319\" class=\"wp-caption-text\">Cabin set in place with a crane<\/figcaption><\/figure>\n<p>If there is not enough room, we will need a crane. And I do not want to have to pay for a crane.<\/p>\n<p style=\"text-align: center;\"><strong>If there is not 60-feet on one end of the foundation, we will need a crane to place the cabin on the foundation.<\/strong><\/p>\n<figure id=\"attachment_13315\" aria-describedby=\"caption-attachment-13315\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-13315\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/cabin-delivery-b.jpg?resize=500%2C375&#038;ssl=1\" alt=\"\" width=\"500\" height=\"375\" \/><figcaption id=\"caption-attachment-13315\" class=\"wp-caption-text\">Westwood Modular Cabin<br \/>Placed on foundation<\/figcaption><\/figure>\n<p>Then the water, power and sewer are connected.<\/p>\n<blockquote><p>Utility hook-ups<br \/>\n\u2022 As soon as the home is set, the septic and water supply can be connected.<br \/>\n\u2022 Once approval from the building department has been obtained, power company can be called for final power hookup<\/p><\/blockquote>\n<p>The plumbing is all finished inside the cabin, but needs to be connected to city water and sewer after it is delivered.<\/p>\n<blockquote><p>Your prefabricated cabin home or office space will be prepared on the inside for electric and plumbing (depending on the model). As a customer, however, you will need the assistance of a licensed professional to complete the utility hookup to the building.<\/p><\/blockquote>\n<p>We also need a porch or at least a landing for each door to get a certificate of occupancy. You can&#8217;t get the power turned on until has passed this final inspection.<\/p>\n<blockquote><p>Porch and step add-ons (optional)<br \/>\n\u2022 This would be handled completely by you and your contractor.<\/p><\/blockquote>\n<p>So, there are a lot of additional costs that are not included in the price of any modular home.<\/p>\n<blockquote><p>In addition to the cost of your cabin, you may incur costs for site prep, foundation, utility hook-ups, porches, and steps.<\/p><\/blockquote>\n<p>We had gotten some prices earlier from other modular companies, so we were not surprised.<\/p>\n<figure id=\"attachment_12376\" aria-describedby=\"caption-attachment-12376\" style=\"width: 400px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-12376\" src=\"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/08\/clayton-modular-costs.jpg?resize=400%2C350&#038;ssl=1\" alt=\"\" width=\"400\" height=\"350\" \/><figcaption id=\"caption-attachment-12376\" class=\"wp-caption-text\">Modular Home Setup Costs (different company)<\/figcaption><\/figure>\n<p>The new cabin is smaller, but that doesn&#8217;t really make a difference for a lot of this. And this doesn&#8217;t even include a driveway.<\/p>\n<p style=\"text-align: right;\"><a href=\"https:\/\/www.projectsmallhouse.com\/blog\/2023\/08\/off-frame-modular-construction-and-setup-costs\/\">3-Bedroom, 2-Bath 1,546 Square Foot Off-frame Modular Construction and Setup Costs &gt;<\/a><\/p>\n<p>*All quotes are from Westwood Cabins Cabin Planning Guide.<\/p>\n<p>The cabin is from <strong>Westwood Cabins<\/strong>. You can see more photos and floor plans at <a href=\"https:\/\/www.westwoodcabins.com\/\" target=\"_blank\" rel=\"noopener\">www.westwoodcabins.com<\/a> and <a href=\"https:\/\/www.facebook.com\/westwoodcabins\" target=\"_blank\" rel=\"noopener\">www.facebook.com\/westwoodcabins<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Cabin Planning Guide from Westwood Cabins lists three phases and we are nearly at the end of the last phase, site work to get our property ready for the home. Westwood Cabins suggested a local contractor, Taylor Fowler. He had helped with a cabin&nbsp;<a class=\"read-more\" href=\"https:\/\/www.projectsmallhouse.com\/blog\/2024\/01\/site-preparation-for-our-new-modular-cabin\/\">&hellip;<\/a><\/p>\n","protected":false},"author":1,"featured_media":13310,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[12],"tags":[],"class_list":["post-13317","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-cottage"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/01\/featured-clearing.jpg?fit=810%2C431&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":13492,"url":"https:\/\/www.projectsmallhouse.com\/blog\/2024\/02\/block-foundation-for-our-small-modular-cabin\/","url_meta":{"origin":13317,"position":0},"title":"Block Foundation for Our Small Modular Cabin","author":"Carla","date":"February 10, 2024","format":false,"excerpt":"The surveyors came back out over the weekend and marked the foundation. They marked the block with where the foundation goes. This man snapped chalk lines on the footing connecting the marks the surveyor had made. A load of block was delivered and moved into place. They mixed water with\u2026","rel":"","context":"In &quot;New Modular Cabin&quot;","block_context":{"text":"New Modular Cabin","link":"https:\/\/www.projectsmallhouse.com\/blog\/category\/new-cottage\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-block.jpg?fit=810%2C431&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-block.jpg?fit=810%2C431&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-block.jpg?fit=810%2C431&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-block.jpg?fit=810%2C431&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13580,"url":"https:\/\/www.projectsmallhouse.com\/blog\/2024\/02\/cabin-progress-report\/","url_meta":{"origin":13317,"position":1},"title":"Cabin Progress Report","author":"Carla","date":"February 22, 2024","format":false,"excerpt":"I've been asked for a floor plan with a progress list with links, so here it is. Click to Open a printable floor plan with measurements Westwood Cabin Floor Plan and Front Elevation Modified Creekside Manor 3016 14'-8\" x 52'-0\" Approved for North Carolina This is where we are at\u2026","rel":"","context":"In &quot;New Modular Cabin&quot;","block_context":{"text":"New Modular Cabin","link":"https:\/\/www.projectsmallhouse.com\/blog\/category\/new-cottage\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/06\/featured-june.jpg?fit=1200%2C638&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/06\/featured-june.jpg?fit=1200%2C638&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/06\/featured-june.jpg?fit=1200%2C638&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/06\/featured-june.jpg?fit=1200%2C638&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/06\/featured-june.jpg?fit=1200%2C638&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":13270,"url":"https:\/\/www.projectsmallhouse.com\/blog\/2024\/01\/westwood-modular-home-pre-delivery-inspection\/","url_meta":{"origin":13317,"position":2},"title":"Westwood Modular Home Pre-delivery Inspection","author":"Carla","date":"January 5, 2024","format":false,"excerpt":"They called us early in December to let us know that our cabin was nearing completion and that we could schedule the Pre-delivery Inspection. They shut down from Christmas till New Year and Cliff was already work-scheduled before that, so the earliest we could make it was yesterday. We accidentally\u2026","rel":"","context":"In &quot;New Modular Cabin&quot;","block_context":{"text":"New Modular Cabin","link":"https:\/\/www.projectsmallhouse.com\/blog\/category\/new-cottage\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/01\/featured-inspection.jpg?fit=810%2C431&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/01\/featured-inspection.jpg?fit=810%2C431&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/01\/featured-inspection.jpg?fit=810%2C431&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/01\/featured-inspection.jpg?fit=810%2C431&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12935,"url":"https:\/\/www.projectsmallhouse.com\/blog\/2023\/12\/planning-a-deck-or-porch-for-the-modular-cabin\/","url_meta":{"origin":13317,"position":3},"title":"Planning a Deck or Porch for the Modular Cabin","author":"Carla","date":"December 6, 2023","format":false,"excerpt":"The plans are approved and stamped, so we meet with a contractor today for an estimate on grading, the foundation and tie-in work, and the utility hookups, sewer, water, and electric, for our new modular cabin. He can also give us a price for the steps, decks or porches or\u2026","rel":"","context":"In &quot;House Plans&quot;","block_context":{"text":"House Plans","link":"https:\/\/www.projectsmallhouse.com\/blog\/category\/house-plans\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-porch.jpg?fit=810%2C431&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-porch.jpg?fit=810%2C431&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-porch.jpg?fit=810%2C431&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-porch.jpg?fit=810%2C431&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13460,"url":"https:\/\/www.projectsmallhouse.com\/blog\/2024\/02\/pouring-footings-small-modular-cabin\/","url_meta":{"origin":13317,"position":4},"title":"Pouring Footings: Small Modular Cabin","author":"Carla","date":"February 8, 2024","format":false,"excerpt":"The very next day a truck backed in with a concrete pump. There was no rain in the near forecast, so we are going to have our footers* poured. I will be so relieved. Last time our footers took months and cost tens of thousands of dollars, so this is\u2026","rel":"","context":"In &quot;New Modular Cabin&quot;","block_context":{"text":"New Modular Cabin","link":"https:\/\/www.projectsmallhouse.com\/blog\/category\/new-cottage\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-footers-1.jpg?fit=810%2C431&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-footers-1.jpg?fit=810%2C431&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-footers-1.jpg?fit=810%2C431&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2024\/02\/featured-footers-1.jpg?fit=810%2C431&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12961,"url":"https:\/\/www.projectsmallhouse.com\/blog\/2023\/11\/final-stamped-and-approved-plan-for-our-modular-cabin\/","url_meta":{"origin":13317,"position":5},"title":"Final Stamped and Approved Plan for Our Modular Cabin","author":"Carla","date":"November 29, 2023","format":false,"excerpt":"We are having a modular cabin built by Westwood Cabins. It is a single modular pre-fab cabin that is being built in South Carolina to be moved to our land in North Carolina. We made revisions to the plans, so they had to be reviewed and approved to \"assure compliance\u2026","rel":"","context":"In &quot;House Plans&quot;","block_context":{"text":"House Plans","link":"https:\/\/www.projectsmallhouse.com\/blog\/category\/house-plans\/"},"img":{"alt_text":"Westwood Cabin Front Elevation Modified Creekside Manor 3016 14'-8\" x 52'-0\" Approved for North Carolina","src":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-stamped_plans.jpg?fit=810%2C431&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-stamped_plans.jpg?fit=810%2C431&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-stamped_plans.jpg?fit=810%2C431&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.projectsmallhouse.com\/blog\/wp-content\/uploads\/2023\/12\/featured-stamped_plans.jpg?fit=810%2C431&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/posts\/13317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/comments?post=13317"}],"version-history":[{"count":10,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/posts\/13317\/revisions"}],"predecessor-version":[{"id":13747,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/posts\/13317\/revisions\/13747"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/media\/13310"}],"wp:attachment":[{"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/media?parent=13317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/categories?post=13317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.projectsmallhouse.com\/blog\/wp-json\/wp\/v2\/tags?post=13317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}