Garage Door

Garage Door
U Save Insulation and Fireplaces put in our garage door - Garage Door – Building our Schumacher Home – Project Small House
U Save Insulation and Fireplaces put in our garage door

When we drove to the new house on Monday, we saw a truck that said U Save Insulation and Fireplaces. Confusing. I thought the insulation was done and we are not having Schumacher put in our fireplaces.

They were installing the garage door.

We spent a week at the beach with the family. Last time we left, they sneaked in and did lots of things while we weren’t looking. This time we didn’t expect much. We are still waiting on the city to get back to us on the sidewalks. The cobalt Corian for the countertops is on back order. It is a good thing they didn’t order it early. The counter has ended up being bigger than expected.

When we got back Sunday it was raining and we were tired, so it was Monday before we got there. They had finished putting the shelves in the closets and they were installing the garage door.

Our contract doesn’t say a lot about the garage. This is it:

Garage Door and Garage Door Opener details on Contract – Building our Schumacher Home – Project Small House
Garage Door and Garage Door Opener details on Contract

Garage Door

The included 16′ x 7′ raised panel garage door is constructed of embossed, high tensile steel panels that give the look of wood with the strength of steel. A two coat coat, baked on white finish is maintenance free for years. The garage door has a polyurethane insulation with a R-9 insulating value

Garage door opener

This garage door opener features a 1/2 hp motor that operates 7 ft. and 8 ft. garage door, and comes with two transmitters.

Garage Service Door details on contract - Garage Door – Building our Schumacher Home – Project Small House
Garage Service Door

Garage Service Door (internal muntins)

Additional door prices include an exterior light fixture & switch, and additional GFI outlet and steps to grade (no steps needed on Garage Service Doors)

It doesn’t need steps because it leads to the carport, which is the same level.

The only other things on the contract, scattered all over, says:

  • There will be G.F.I. electrical outlets front & back and in the garage (per plan). (vca1916)
  • Exterior garage walls and garage ceilings are not insulated (per plan).
  • The garage is completely finished with drywall (per plan).
  • The garage walls (per plan) are completely painted.

Installing the Garage Door

So, here is what we know about our garage door.

Screwing in the reinforcing bars - Garage Door – Building our Schumacher Home – Project Small House
Screwing in the reinforcing bars

The garage door has reinforcing bars to keep it from blowing in.

Adjusting the spring, I think - Garage Door – Building our Schumacher Home – Project Small House
Adjusting the spring, I think

The track has a spring assembly. It is easier to push the door up than it is to pull it down.

Adjusting the Garage Door – Building our Schumacher Home – Project Small House
Adjusting the Garage Door

They made a lot of adjustments before they attached the door to the ceiling.

Adjusting the garage door opener - Garage Door – Building our Schumacher Home – Project Small House
Adjusting the garage door opener

They ran an extension cord to the garage door opener to make sure it worked.

Adjusting the garage door - Garage Door – Building our Schumacher Home – Project Small House
Adjusting the garage door

They made a lot of little adjustments to make sure that it raised and lowered smoothly.

Putting in the garage door opener - Garage Door – Building our Schumacher Home – Project Small House
Putting in the garage door opener

The stickers were applied by the installer. Cliff collected all the papers and the two clickers. There is another clicker by the door from the laundry room into the garage.

Linear Pro Access Garage Door Opener - Garage Door – Building our Schumacher Home – Project Small House
Linear Pro Access Garage Door Opener

This is the box they took the garage door opener out of.

Linear
Building On Innovation

Garage Door Operator LSO50

Professional Installer’s 1st Choice

  • ½ HP Premium
  • Noise and Vibration Reduction Technology
  • Interchangeable, Chain or Belt Drive
  • Compatible with 7’, 8’, 10’ or I-beam Rails

Entry Solutions

This is what I found on-line about it.

Linear Pro Access Garage Door Openers

Deluxe dual-lamp 1/2 HP residential garage door operator with superior vibration isolation mounting brackets and noise dampening acoustical foam, compatible with belt & chain drive rails.

  • Noise reduction technology
  • Compatible with belt-drive or chain-drive T or I beam rails up to 10′
  • Smooth, quiet operation
  • Diagnostic system indicates six possible trouble conditions
  • Dual 100-watt courtesy lights (bulbs not included)
  • Built-in MegaCode format receiver
  • All operator controls and indicators on one side
  • Operator includes three-button MCT-3 visor transmitter and deluxe wall station

Motor Warranty: Lifetime
Belt Warranty: Lifetime
Chain Rail Warranty: 5 yrs
Mechanical Parts Warranty: 5 yrs
Electrical: 1 yr

I asked about the sign on the truck. They are the crew that did some of our insulation. They are also the same crew that put in the closet shelves.

The garage door installed - Garage Door – Building our Schumacher Home – Project Small House
The garage door installed

So, here it is. All installed. It is still cold and drizzly. I hate winter.

The city has got back to us. They prefer we pay into the city sidewalk fund. So, we don’t get a sidewalk. Someone else does. But it will cost a bit less and it won’t slow up our getting a CO.

Next: Cobalt Blue Corian Countertops >

The trim around the garage door is done. - Finishing the Plaster and Paint - Project Small House
The trim around the garage door is done.

This is the garage door after they finished trimming it out.