Recent Posts

Shingles on the Roof

Shingles on the Roof

The underlayment, drip edge and flashing were finished last week and the shingles were delivered Friday. The roofers started early the next morning. They were out here by 5:30 on Saturday. Roofing is hot hard work! It was so hot by 11:30, they were wrapping 

Plumbing Pressure Test

Plumbing Pressure Test

The plumbers left these gauges on the pipes. I googled to see what they are for. This is one way to test for leaks. We have water, but it only goes to a faucet in the front yard. This way they can inspect for leaks 

Shingles are Delivered

Shingles are Delivered

When I pulled up they were delivering the shingles. They used a crane to put the shingles on the roof. The crane is remote controlled. The roof vents are in the garage. That’s it. That’s the post. They just unloaded the truck and left. The 

Building the Porches

Building the Porches

More materials have been delivered. The skips are gone and we have a new empty one. And… They have started on the porches! The plans have a nice front porch. It is 17’ wide and 6’ deep. The log cabin has a huge front porch. 

Rough Plumbing

Rough Plumbing

I drove by to see what was going on and I could tell something had changed. There was a ramp to get into the house and there was pipe in the garage. The laundry room has the washer and dryer plumbed. We have colored water 

Putting in the Doors

Putting in the Doors

Tuesday the doors were delivered. By the time we got down there, he had already put in the door that goes from our bedroom to the back porch. But I got to see him install the front door. First the installer trimmed the opening the 

Installing the Windows

Installing the Windows

We drove over to the new house this morning. They were wrapping up the wiring. And look! The windows and doors were delivered! They window installer checked the plans, then carried each window to where it would be installed. These directions are on the window. 

Finishing the Rough Electrical

Finishing the Rough Electrical

They started the wiring last Friday. Cliff went in over the weekend and added the wires for security, internet and speakers. He is going to put the house’s brain in the closet off the entry. The electricians wrapped up on Monday. One of the electricians 

Electrical Walk-through

Electrical Walk-through

The contractor called this morning to ask if we could meet the electrician for a walk-through. The electrician had read my plan and had it all marked out. He had emailed me back after all. I found it in the Spam folder. Lighting and Electrical 

They Got the Roof On!

They Got the Roof On!

I can’t believe they were able to get the roof on! We have had unbelievable weather for the last few weeks. We set a record for rainfall over the last two weeks. The previous record for May was 9.18 inches. We had 17 inches. There