Surveying and Marking the Footers for the Block

Surveying and Marking the Footers for the Block

The concrete in the footers has dried. The surveyor came out to mark where the block will go. He put in nails and spray painted them to make them highly visible. This is one of the piers to hold up the porch. I walked the 

Transplanting Daffodils to the New House

Transplanting Daffodils to the New House

I put some daffodils in the field at our new house. When I visited Ireland, I saw fields that were filled with daffodils. I decided to put some in that will be visible in the spring from living room, dining room and our bedroom windows. 

Lakewood Shed Kit with Large Dormer

Lakewood Shed Kit with Large Dormer

The Lakewood Shed Kit has nearly all the parts you need to build this 2-story building. You can use the kit to make a storage building, workshop, studio or she-shed. Pull the permits and follow code to make a Tiny House. The Lakewood Shed Kit 

Inspection and Pouring Footers

Inspection and Pouring Footers

The guys were out early on Thursday morning. They finished the last bits of gravel and spread the final fabric pieces to tuck our gravel in nice and cozy. They placed spikes to mark the depth for the concrete. They put a piece of wood 

Documents from the Engineer

Documents from the Engineer

Here are more of the documents from the engineer. BLE inc. Bunnell-Lammons Engineering, Inc. Geotechnical, Environmental and Construction Materials Consultants 3-2-2018 Upont client’s request, staff professional K. Williams visited site to observe the foundation excavations of the proposed home. The excavations were extended to -5 

More Progress on the Engineered Footers

More Progress on the Engineered Footers

Monday morning, March 5, they were out early and making good progress. The footers were so caved in and such a mess at this point, they kept re-surveying and checking to be sure they were following the new plan. They created a “well” and put 

Progress on Re-Digging the Footers

Progress on Re-Digging the Footers

After a long weather delay, they got back to work on Friday, March 2. They started re-digging the footers and pumping the water out of them. The geotextile fabric and loads of gravel were delivered. What is the fabric? The fabric is Thrace-Linq® 125EX. I 

The Calumet 576 Foot Cabin Shell from Tuff Shed

The Calumet 576 Foot Cabin Shell from Tuff Shed

Buy a cabin shell from Tuff Shed and finish the interior yourself! The Calumet 576 Foot Cabin Shell from Tuff Shed is 24 x 24 with a 6-foot deep front porch. The entire 24-foot front is a 6-foot deep porch. The Calumet Tuff Shed Cabin 

Back to Work! Starting on the Engineered Footers

Back to Work! Starting on the Engineered Footers

It is March and they are finally working on our house again! Woo Hoo! The last time they were out there was on January 17th. We got the Engineer’s Excavation Report on January 22nd and gave them an additional check to keep going. We pulled 

Master Bath in the Schumacher Homes Blue Ridge Model

Master Bath in the Schumacher Homes Blue Ridge Model

This is the Master Bath in the Schumacher Homes Blue Ridge Model. It is not at all what we are building, but I thought I would share. The sinks are completely separated. No tripping over each other here. Probably no sharing the same toothpaste, either.